
Construction
- Drill and install borefield from the surface, before shoring and excavation.
- After excavation, return to install lateral connections below the slab.
- Carry out mechanical installation, connections, and commissioning of the system.
- Collaborate with your project management team throughout the project to minimize scheduling impacts.
